VietNamNet/VNA
VietNamNet Bridge – Electricity of Vietnam (EVN) and Electricity of Cambodia (EDC) will put into operation a 220kV power line on March 30, an important step towards effecting electricity sales to Cambodia, according to EVN Deputy General Director Dang Hoang An.
The Chau Doc (Vietnam) – Takeo (Cambodia) power line is part of an agreement signed in March 2003 between the two governments and a contract between EVN and EDC.
According to EVN, the line has a maximum transmitting capacity of 200MW.
The Chau Doc (Vietnam) – Takeo (Cambodia) power line is part of an agreement signed in March 2003 between the two governments and a contract between EVN and EDC.
According to EVN, the line has a maximum transmitting capacity of 200MW.
No comments:
Post a Comment